Welcome to LandOLights.com!

Home arrow Pictures & Video arrow Pictures
Home » 2009 Photos » Ren Enclosure Construction
Back to Category Overview
Ren Enclosure Construction

All drilled.  Holes are SHARP, and metal slivers HURT!  Use gloves and file everything down.
All drilled. Holes are SHARP, and metal slivers HURT! Use gloves and file everything down.

Apply a thin layer of heat sink compound and bolt everything together
Apply a thin layer of heat sink compound and bolt everything together

CG2000 Enclosure
CG2000 Enclosure

I used heavy duty dongles, so I had to cut the holes bigger
I used heavy duty dongles, so I had to cut the holes bigger

I needed maximum space, so I mounted my board all the way to the hinge side
I needed maximum space, so I mounted my board all the way to the hinge side

The first set of wires
The first set of wires

Cut wires to correct length
Cut wires to correct length

Be neat
Be neat

Tie grounds from 1-12 to first power cord ground, 13-24 to second.  DONE!
Tie grounds from 1-12 to first power cord ground, 13-24 to second. DONE!
 
There are 18 pictures in this category.
«« Start  « Prev   1  [2]  Next »  End »»
Back to Category Overview

In total there are 333 pictures in the categories.
Version 2.5.1, BUILD 20080226
The Christmas Lights WebRing by tfischer
[ Join Now | Ring Hub | Random | << Prev | Next >> ]
(C)2006-2016 LandOLights.com/loltechnical.com. All rights reserved.